Phase 1 Temple (Future Community Center)

Paschim Shirdi | Land Acquisition | Master Plan | Phase 1 Temple | Development Status | Ways to Help

We aim to move to the Paschim Shirdi land as soon as possible. Our land team and Civil and Architectural consultants did a feasibility study on setting a cost-effective building to move in with the expectation that the building will 1) Continue to facilitate the same ambiance as the current temple 2) Community Kitchen 3) Future community center needs. Our feasibility study included steel structures, prefab structures, and traditional buildout. Those options were presented to the governing body and approved to proceed with the proposed layout below. Our goal is not only to look at current needs, we also are looking at future usability and expansion costs.

The scope of Phase 1 is shown in the picture below

Here are the architectural floor plans of the proposed Phase 1 temple (future community center)